Renovation of cooling water culvert at Mälarenergi

  • Lästid: 2 minuter

From idea to renovated facility

Mälarenergi faced a significant challenge when it needed to carry out renovation work on a cooling water culvert dating back to the 1970s, located under the harbour area. Much of the work was carried out underwater in Lake Mälaren, requiring the use of certified commercial divers.

Project manager's responsibility for communication, risk analysis and final negotiations

In addition to planning, organisation and implementation, the project manager has been responsible for communication and coordination between the activities and the project, as well as the design and recommendation of the technical solution. We have also been committed to carefully negotiating and establishing contracts with designers to ensure that all planning, management and coordination of the design is carried out to the highest standards. We have ensured that all the necessary audits are carried out in accordance with the specifications set by the contracting authority, and have ensured that the contractor establishes and maintains the required control, quality, health and safety and environmental plans.

Our responsibilities have also included procurement and contracting, carried out in co-operation with the procurement officers, to meet the needs of the project. We have been actively involved in the preparation and monitoring of comprehensive scope, time, financial, resource, quality and health, safety and environment (HSE) plans.

We have also maintained ongoing communication with contractors to effectively manage the construction process, engaged surveyors, and ensured that necessary inspections were carried out. Furthermore, we handled final negotiations with contractors, conducted risk assessments, and performed workplace safety evaluations to uphold the integrity and safety of the project.

The project resulted in the renovation of 20 metres of the total 180-metre culvert. The remaining 160 metres, for potential future renovation, were referred for further investigation and analysis.

The article was published 18 March 2020


We have the ambition to make the world better together

At Sigholm, we believe in developing skills in the long term to build the company together. Through shared reflections, we create a culture of continuous learning.

Career at Sigholm

Latest news

Feb 13, 2026 | News | News & press

Niclas Sigholm utsedd till en av Sveriges 100 ledare som driver energiomställningen

Energiomställningen beskrivs ofta som en av vår tids största samhällsutmaningar. I ett energisystem under snabb förändring är det människorna bakom innovationerna, investeringarna och besluten som gör skillnaden. Energy Loops lista lyfter fram just d

Feb 12, 2026 | News | News & press

Nytt segment i Energistrategipodden: Reflektionssamtal om energiomställningens vägval

Energistrategipodden lanserar ett nytt segment – Reflektionssamtal – där vi fördjupar diskussionen om energiomställning, energimarknad och energisystemets utveckling. Först ut är en analys av samtalet med Unipers Sverige-vd Johan Svenningsson (avsnit

Jan 22, 2026 | News & press | Press release

Aurora by Sigholm accepted into Swedish-German Cleantech Platform 2026

We are proud to announce that Aurora by Sigholm (AbS) has been accepted into the Swedish-German Cleantech Platform (SGCP) 2026, an international accelerator programme that supports innovative Swedish cleantech companies in their establishment and gro

Contact Us

Fill out the form, and we will get back to you, visit one of our offices, or call us at +46(0)21-12 03 10.

By clicking send, you agree to Sigholm's handling of your personal data. Read our personal data policy